Spanish company CYMI has completed operational testing of a 5.8 MWh sodium‑sulfur (NaS) battery at the City of Energy Foundation’s (CIUDEN) Integra2H2 project, integrated with a 2.1 MW solar plant and two electrolyzers to produce green hydrogen.
August 20, 2025
Pilar Sánchez Molina
Image: Ciuden
From ESS News
Spanish company CYMI (Control y Montajes Industriales, of the COBRA IS group) has completed operational testing of the sodium-sulfur (NaS) energy storage facility which is part of Integra2H2, an energy storage and green hydrogen production project of the City of Energy Foundation (CIUDEN).
The NaS battery system operates at CIUDEN’s Technology Development Center in Cubillos del Sil, at a temperature of 305 C.
The maximum nominal charge and discharge power of the batteries is 1 MW/750 kW, and the minimum nominal stored energy is 5.8 MWh.
To continue reading, please visit our ESS News website.
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.
Popular content
https://www.pv-magazine.com/2025/08/20/spains-ciuden-tests-5-8-mwh-sodium%E2%80%91sulfur-battery-with-solar-and-hydrogen/