Latest
Features , Interviews , News
Features , Featured Articles , Long Reads
Polish IPP R.Power has been awarded 85MW of solar PV capacity in Romania’s first CfD. Image: R.Power.
Romania’s Ministry of Energy’s has awarded 432MW of solar PV capacity across 11 projects in its first Contracts for Difference (CfD) scheme.
The CfD ended up more than three times oversubscribed, with over 1.6GW of solar PV bids for 500MW available capacity. Despite that, the auction closed with just 432MW allocated. The CfD was initially expected to be launched in 2023.
This article requires Premium Subscription Basic (FREE) Subscription
Unlock unlimited access for 12 whole months of distinctive global analysis
Photovoltaics International is now included.
Regular insight and analysis of the industry’s biggest developments
In-depth interviews with the industry’s leading figures
Unlimited digital access to the PV Tech Power journal catalogue
Unlimited digital access to the Photovoltaics International journal catalogue
Access to more than 1,000 technical papers
Discounts on Solar Media’s portfolio of events, in-person and virtual
Or continue reading this article for free
In comparison, a little bit over 1GW of wind capacity was awarded for the 1.2GW offered.
The weighted average price of electricity production for solar PV was €51/MWh (US$53.5/MWh), while wind averaged €65/MWh. Solar PV saw a maximum price offer of €54.18/MWh and a minimum bidding price of €45.05/MWh.
A second CfD auction is to be held in 2025 and will seek 2GW of solar PV capacity. The European Bank for Reconstruction and Development (EBRD) recently signed a memorandum of understanding with Romania to help the country implement the second CfD auction next year.
In the agreement between the EBRD and Romania, a support scheme and related auctions for energy storage systems will also be implemented. Last month, the Ministry of Energy awarded grants to nearly 800MWh of battery energy storage systems through the Recovery and Resilience facility, as covered by our sister-site Energy-storage.news.
Sebastian Burduja, Romania’s Minister of Energy, said: ” We had a significant number of participants, and the resulting prices are very competitive, 20-30% below maximum prices. All our expectations regarding the success of this first auction were exceeded, which confirms the confidence that investors have in Romania and in the future of our energy system.”
The funding for both rounds of the CfD auctions comes from Europe’s Modernisation Fund which seeks to help ten member states – including Romania – modernise their energy systems. The budget for the two rounds is estimated at €3 billion (US$3.3 billion).
Polish independent power producer R.Power was among the companies awarded in Romania’s first round of CfD. Five projects were awarded a 15-year contract. These five solar PV projects have a combined capacity of 85MW, with the largest having a capacity of 55MW. All projects are set to be operational by 2026.
Moreover, the company recently started construction on a 23MWp solar PV portfolio in Romania.
UK Solar Summit 2025 will look at the role solar currently plays in the energy mix, how this will change over the coming years and how this aligns with net-zero and other government targets. We will break down all these challenges and help build up solutions through discursive panels, motivational keynotes and case studies, with newly added interactive sessions to get you moving and meeting your peers, making the connections you need to boost your business.
Read Next
The EBRD has signed a memorandum of understanding with Romania to support the rollout of new renewable power auctions in the country.
Germany’s rooftop solar tender ended up with a record 434MW of capacity bid, while France’s was undersubscribed.
In total, 540 projects were awarded capacity in a tender that ended up oversubscribed with more than 1.7GW capacity tendered and 643 bids.
The European Bank for Reconstruction and Development (EBRD) has lent up to €50 million to a 237.6MW solar PV plant in Bulgaria.
Ahead of the Large Scale Solar Central Eastern Europe event, PV Tech spoke to Rezolv’s Alastair Hammond about the company’s work in Romania.
The Dubai Electricity and Water Authority has issued a tender seeking advisory services for a co-located 1.6GW solar PV/1GW BESS project.
Subscribe to Newsletter
Most Read
Upcoming Events
Solar Media Events , Upcoming Webinars
PV Tech is part of the Informa Markets Division of Informa PLC
This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC’s registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.
Copyright © 2024. All rights reserved. Informa Markets, a trading division of Informa PLC.
https://www.pv-tech.org/romania-awards-432mw-solar-pv-in-oversubscribed-cfd/





