Latest
Features , Editors’ Blog , Long Reads
Features , Editors’ Blog , Long Reads
The project consists of a 45MW solar facility and co-located 35MW/36.7MWh battery energy storage system (BESS). Image: APA Group.
The APA Group, an Australian energy company, has completed the installation of solar panels at its Port Hedland solar-plus-storage project in Australia.
The project consists of a 45MW solar facility and co-located 35MW/36.7MWh battery energy storage system (BESS), located in the Pilbara region of Western Australia. The Monford Group, an Australian construction company, and the Shanghai Electric Company were both involved in the construction of the project, which the APA Group expects to commission in “late 2024”.
This article requires Premium Subscription Basic (FREE) Subscription
Unlock unlimited access for 12 whole months of distinctive global analysis
Photovoltaics International is now included.
Regular insight and analysis of the industry’s biggest developments
In-depth interviews with the industry’s leading figures
Unlimited digital access to the PV Tech Power journal catalogue
Unlimited digital access to the Photovoltaics International journal catalogue
Access to more than 1,000 technical papers
Discounts on Solar Media’s portfolio of events, in-person and virtual
Or continue reading this article for free
The APA Group’s work also includes a 1km cable to connect the project to the existing Port Hedland Power Station, and extending an existing switchyard at the power station to accommodate the new facilities.
The installation of panels is an important milestone for a project that has been making headlines for several years. The project was initially developed by Australian utility Alinta, which signed a power purchase agreement (PPA) to sell power generated at the project to Australian mining giant BHP, and selected CIMIC Group subsidiary UGL to design, test and commission the BESS at the project in 2023.
The APA Group acquired Alinta in 2023, and has continued development at the project, which, if it is as productive as the developers expect, will power the daytime operations of BHP’s processing and exporting facilities at Port Hedland, on the north coast of Australia.
The port is one of the busiest in the global iron sector, with around 48.5 million tonnes of iron ore leaving Port Hedland for China alone in June of this year, a 6.28% increase over June of the previous year.
The milestone is the latest positive development for the Australian solar sector, which has around 5.5GW of projects currently in development, according to the latest figures from the Australian Clean Energy Council (CEC).
Read Next
The PV industry is set for a humbling 2025, with the current manufacturing downturn expected to extend well into 2026.
India has called for comments on its proposed addition of cells to its Approved List of Models and Manufacturers (ALMM).
Due to a lack of state government support, Australian mineral exploration company Province Resources has shelved its multi-gigawatt solar and wind-powered green hydrogen project in Western Australia, HyEnergy.
Acen Australia’s 600MW Birriwa solar-plus-storage project in New South Wales has been granted federal approval from Tanya Plibersek, Australia’s minister for the environment and water.
Swedish solar developer OX2 on Thursday (5 September) agreed to sell a 119MW solar PV project in Victoria, Australia, to an undisclosed bidder.
Special funding for certain states could complicate other incentive schemes, while a ten million household rooftop PV scheme faces challenges.
Subscribe to Newsletter
Most Read
Features , Editors’ Blog , Long Reads
Upcoming Events
Huntington Place Detroit, MI
San Francisco Bay Area, USA
https://www.pv-tech.org/apa-group-installs-solar-panels-port-hedland-solar-plus-storage/