A Plus leads AKA Energy delegation to Presidency over 270MW solar project

A Plus leads AKA Energy delegation to Presidency over 270MW solar project

Member of Parliament for Gomoa Central, Kwame Asare Obeng, popularly known as A Plus, has announced plans for the construction of a 270-megawatt solar energy project to power the Gomoa Special Economic Zone and the Gomoa Eco Park.

According to the MP, a delegation from AKA Energy Systems, led by its Chief Executive Officer, met with President John Dramani Mahama earlier yesterday, September 8, to formally inform him that preparations towards the project have commenced.

In a post, A Plus, who led the delegation to the Presidency, disclosed that the project will be a major power source for the manufacturing, industrial and commercial hub.

He stated that the project will be developed in phases, with Phase One expected to be completed by the end of 2027.

By Edem Mensah-Tsotorme

Read Next September 9, 2026

Ghana deepens ties with Barbados – Ambassador Baba Sadiq September 9, 2026

John Boadu campaign welcomes Wontumi’s endorsement September 9, 2026

NPP calls for national conversation on education crisis September 9, 2026

Salam Mustapha withdraws from NPP National Organiser race September 9, 2026

Education Ministry warns against fake CSSPS placement slips September 9, 2026

Transport Minister seeks end to clearance delays September 9, 2026

Abandoned drains turn into death traps in Kintampo September 9, 2026

90% of WASH projects donor-funded — WaterAid September 9, 2026

Invest in youth for West Africa’s peace – Veep September 9, 2026

Long queues hit CSSPS resolution centres

https://ghanaiantimes.com.gh/a-plus-leads-aka-energy-delegation-to-presidency-over-270mw-solar-project/