QatarEnergy, Samsung C&T ink EPC contract for 2GW solar PV project in Qatar

QatarEnergy, Samsung C&T ink EPC contract for 2GW solar PV project in Qatar

Latest

Features , Guest Blog , Long Reads

The project will reach its total electricity generation capacity of 2GW by mid-2029. Image: Qatar Energy.

Qatari state-owned petroleum company QatarEnergy has signed an engineering, procurement and construction (EPC) agreement with Korean tech giant Samsung’s engineering and construction vertical Samsung C&T for its 2GW Dukhan project.

The Dukhan solar power plant, about 80km west of Doha, will be developed in two phases The project will reach its total electricity generation capacity of 2GW by mid-2029. Once completed, it will double Qatar’s operational solar capacity.

This article requires Premium Subscription Basic (FREE) Subscription

Already a subscriber? Sign In

Try Premium for just $1

Full premium access for the first month at only $1
Converts to an annual rate after 30 days unless cancelled
Cancel anytime during the trial period

Premium Benefits

Expert industry analysis and interviews
Digital access to PV Tech Power journal
Exclusive event discounts

Or continue reading this article for free

Qatar’s energy minister Saad Sherida Al-Kaabi said that the agreement is an important milestone in the country’s environmental strategy, as stipulated by Qatar National Vision 2030. One of the key goals of the country’s sustainability strategy is to have more than 4GW of renewable energy capacity in operation by 2030, Al-Kaabi noted.

Announced in 2024, the ‘mega project’ will begin the first phase of production by generating 1GW of power, for the power grid operator Kahramaa, towards the end of 2028. The plant, installed with a solar tracker system, aims to enhance efficiency by using inverters capable of operating in high-temperature regions.

Recently, Qatar inaugurated two solar projects with a combined capacity of 875MW, which more than doubled its installed solar capacity. The projects, located in the industrial cities of Mesaieed (417MW) and Ras Laffan (458MW), use high-efficiency bifacial modules mounted on single-axis trackers and usecleaning robots to minimise losses in energy yield. In 2022, QatarEnergy selected Samsung C&T as the EPC contractor for two solar PV plants.

Moreover, TotalEnergies commissioned the 800MW Al Kharsaah solar power plant near Doha, Qatar in October 2022. The project was constructed in a 1,000-hectare area and contains two million bifacial modules mounted on single-axis trackers.

It was developed under a consortium formed by TotalEnergies and Marubeni and Siraj Energy, a QatarEnergy subsidiary. The project signed a 25-year power purchase agreement (PPA) with Kahramaa and covers up to 10% of Qatar’s peak power consumption. 

Read Next

Artificial intelligence (AI) company Avathon has launched its AI-powered Autonomy Platform to boost profitability in a market that is facing tax and policy challenges. 

Spanish oil major Repsol has started commercial operations at its 629MW Outpost solar facility located in Webb County, Texas near Laredo. 

Australia has committed to cutting greenhouse gas emissions by 62-70% below 2005 levels by 2035, Prime Minister Anthony Albanese announced on Thursday (18 September).

CERC is finalising guidelines for virtual power purchase agreements (vPPAs) to unlock financing for over 40GW of uncontracted renewable capacity.

Indian PV makers have welcomed the government’s plan to add solar wafers to its ALMM List-III from June 2028.

Spanish renewables developer and operator Acciona Energía has commissioned its 412MWp Juna solar PV plant in Kawani village in the western state of Rajasthan. 

Subscribe to Newsletter

Most Read

Features , Guest Blog , Long Reads

Upcoming Events

San Francisco Bay Area, USA

PV Tech is part of the Informa Markets Division of Informa PLC

This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC’s registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

Copyright © 2025. All rights reserved. Informa Markets, a trading division of Informa PLC.

https://www.pv-tech.org/qatarenergy-samsung-ct-ink-epc-contract-for-2gw-solar-pv-project-in-qatar/