Latest
The Parque Solar Anchoris, pictured above, brings Genneia’s operational solar PV portfolio to 490MW in Argentina. Image: Genneia.
Argentinian renewables developer Genneia has reached commercial operations at its 180MW Parque Solar Anchoris in Argentina.
Located in the western province of Mendoza, it is the second solar PV plant operational in the region after the company commissioned the 90MW Parque Solar Malargüe I earlier this year.
This article requires Premium Subscription Basic (FREE) Subscription
Unlock unlimited access for 12 whole months of distinctive global analysis
Photovoltaics International is now included.
Already a subscriber? Sign In
Regular insight and analysis of the industry’s biggest developments
In-depth interviews with the industry’s leading figures
Unlimited digital access to the PV Tech Power journal catalogue
Unlimited digital access to the Photovoltaics International journal catalogue
Access to more than 1,000 technical papers
Discounts on Solar Media’s portfolio of events, in-person and virtual
Or continue reading this article for free
Already a subscriber? Sign In
The 180MW site will power the demand of large industrial users within the framework of the Renewable Energy Term Market (MATER), a private market in Argentina with specific regulations, in which renewable energy purchase and sale transactions between private parties take place.
“This park will be designed to supply efficient and competitive energy to corporate clients across all sectors of the economy,” said Bernardo Andrews, CEO of Genneia.
The project required a US$160 million investment and has 360,000 bifacial solar panels installed. With the commercial operations of Parque Solar Anchoris, the Argentinian developer now has 490MW of solar PV operational in the Cuyo region – which comprises the provinces of Mendoza, San Luis and San Juan – across five solar PV plants.
The company’s operational capacity is set to reach nearly 800MW in 2026 when two more projects under construction begin commercial operations: the San Rafael plant in the Mendoza province with 180MW of solar PV and the San Juan Sur in the San Juan province with 130MW of solar PV.
Increased interest in renewables in Argentina is not limited to solar PV, with the government launching its first battery energy storage system (BESS) tender seeking capacity in the capital, Buenos Aires. The AlmaGB scheme recently received bids with a total of 1.3GW volume submitted, twice the available capacity for the tender, as covered by our sister site Energy-storage.news.
Read Next
July 2025, the peak of the Australian winter season, saw generation from utility-scale and rooftop solar increase by 12.78% year-on-year in the National Electricity Market (NEM).
Independent power producer (IPP) Scatec has secured BRL150 million (US$27 million) for its 142MW solar PV plant in Minas Gerais, Brazil.
During H1 2025, China has added 211.61GW of new PV capacity, more than doubling last year’s figures when installs reached 102.5GW in H1 2024.
Independent power producer GoldenPeaks Capital has reached commercial operations on a 92MW solar PV portfolio in Hungary.
Solar developer Atlas Renewable Energy has secured BRL1 billion (US$179 million) in financing for a 579MW Brazilian solar PV complex.
Australia’s Clean Energy Finance Corporation (CEFC) has announced it has invested a record AU$4.7 billion (US$3.09 billion) in large-scale renewables, energy storage, and transmission projects during the 12-month period ending 30 June 2025.
Subscribe to Newsletter
Most Read
Upcoming Events
PV Tech is part of the Informa Markets Division of Informa PLC
This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC’s registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.
Copyright © 2025. All rights reserved. Informa Markets, a trading division of Informa PLC.
https://www.pv-tech.org/genneia-commissions-180mw-solar-pv-in-argentina/