Arctech signs 1.5GW solar PV tracker supply deal for Al Ajban project in the UAE

Arctech signs 1.5GW solar PV tracker supply deal for Al Ajban project in the UAE

Latest

Features , Guest Blog , Long Reads

Arctech will supply its SkyLine II solar tracking systems to the 1.5GW Al Ajban project in the United Arab Emirates (UAE). Image: Arctech via PR Newswire.
Chinese PV tracker provider Arctech has secured a 1.5GW solar tracker supply agreement with Chinese state-owned energy company PowerChina.

The supply agreement is for Arctech’s 1P single-axis solar tracking system SkyLine II and will be delivered to the Al Ajban project in the United Arab Emirates (UAE). The 1.5GW solar PV project was awarded to French energy giant EDF Renewables and the Korean Western Power Company (KOWEPO) last year by Abu Dhabi’s Emirates Water and Electric Company (EWEC).

This article requires Premium Subscription Basic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis
Photovoltaics International is now included.

Regular insight and analysis of the industry’s biggest developments
In-depth interviews with the industry’s leading figures
Unlimited digital access to the PV Tech Power journal catalogue
Unlimited digital access to the Photovoltaics International journal catalogue
Access to more than 1,000 technical papers
Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The 1.5GW Al Ajban project is also owned by Emirati state-owned renewable energy project developer Masdar, which owns 60% of the project, while EDF Renewables and KOWEPO own 20% each.

The project reached financial close in September 2024, and the joint venture did not disclose the funds raised. Masdar did specify that the financing for the project will be provided by six institutions: BNP Paribas, Credit Agricole, the Export-Import Bank of Korea, HSBC Middle East, Standard Chartered and the Sumitomo Mitsui Banking Corporation.

This is the latest PV tracker supply agreement for Arctech in the Middle East, where it secured a 2.3GW supply agreement for its tracking system SkyLine II for a project in Saudi Arabia last November.

Arctech is currently building a solar tracker manufacturing plant in Saudi Arabia and expects the project to be operational in 2025. Once operational, the manufacturing plant will have an annual capacity of 15GW. Alongside the manufacturing facility in Saudi Arabia, Arctech also has a research and development (R&D) centre in the Middle East.

Read Next

Round-up of news from China with solar module manufacturers Trina Solar, GCL-Perovskite and Chinese firm Shanghai Electric.

Masdar acquired 70% of Terna Energy’s outstanding shares at €20 per share, valuing the company at an enterprise value of €3.2 billion.

SolarEdge has closed its utility-scale battery storage division, resulting in a layoff of roughly 12% of its total workforce.

Helena Li, president at Trinasolar, spoke with PV Tech about diversifying solar manufacturing and localising products for specific markets.

Masdar plans to develop including over 6GW of new solar capacity and 4GW of new solar manufacturing capacity in Egypt.

The Dubai Electricity and Water Authority has issued a tender seeking advisory services for a co-located 1.6GW solar PV/1GW BESS project.

Subscribe to Newsletter

Most Read

Upcoming Events

Solar Media Events , Upcoming Webinars

Solar Media Events , Upcoming Webinars

PV Tech is part of the Informa Markets Division of Informa PLC

This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC’s registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

Copyright © 2025. All rights reserved. Informa Markets, a trading division of Informa PLC.

https://www.pv-tech.org/arctech-signs-1-5gw-solar-pv-tracker-supply-deal-for-al-ajban-project-in-the-uae/