Gautam Solar to expand module manufacturing capacity to 5GW by April 2025

Gautam Solar to expand module manufacturing capacity to 5GW by April 2025

Latest

Features , Interviews , Long Reads

“This initiative is not just about scaling up—it’s about driving innovation,” said Gautam Mohanka. Image: Gautam Solar.
Indian solar manufacturer Gautam Solar has announced plans to expand its module manufacturing capacity to 5GW by April 2025.

The company plans to complete its module manufacturing expansion in three phases, to be completed in November 2024, January 2025 and April 2025. Gautam Solar also noted that its under-development 2GW, US$119 million (INR10 billion) tunnel oxide passivated contact (TOPCon) cell manufacturing facility, unveiled in September, will receive additional funding through an initial public offering, which the company expects to complete within the next 12-18 months.

This article requires Premium Subscription Basic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis
Photovoltaics International is now included.

Regular insight and analysis of the industry’s biggest developments
In-depth interviews with the industry’s leading figures
Unlimited digital access to the PV Tech Power journal catalogue
Unlimited digital access to the Photovoltaics International journal catalogue
Access to more than 1,000 technical papers
Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

“Currently, India’s solar energy capacity stands at around 70GW, and with this expansion, Gautam Solar will account for nearly 5-7% of the country’s total capacity,” said Gautam Solar managing director Gautam Mohanka. “This initiative is not just about scaling up—it’s about driving innovation, creating new jobs and offering solar products specifically designed to meet India’s unique environmental and economic needs.”

The news is Gautam Solar’s latest announcement in the capacity additions space, following plans to double its module manufacturing capacity, first announced in September 2023. This latest announcement comes at a time of considerable growth in the Indian upstream solar manufacturing space, with Mercom India reporting that the country added 11.3GW of module manufacturing capacity in the first half of this year alone, representing around one-seventh of India’s total operating module manufacturing capacity.

Much of this growth has been encouraged by the reimposition of the Approved List of Models and Manufacturers (ALMM), a list of companies whose projects can benefit from government support. The list aims to encourage Indian companies to invest in renewable power generation technologies, such as solar panels, and was temporarily suspended last year to allow Indian manufacturers time to scale up their operations; now that the ALMM is back in place, there are significant incentives to building modules domestically.

Earlier this year, Ali Imran Naqvi, CEO of solar advisory Gensol Group, told PV Tech Power that the reimposition of the ALMM “prioritises Indian manufacturers, potentially creating a fairer playing field and incentivising domestic production,” with regards to the massive manufacturing capacity and low production costs seen in the Chinese manufacturing sector in particular.

Understanding PV module supply to the European market in 2025. PV ModuleTech Europe 2024 is a two-day conference that tackles these challenges directly, with an agenda that addresses all aspects of module supplier selection; product availability, technology offerings, traceability of supply-chain, factory auditing, module testing and reliability, and company bankability.

The conference will gather the key stakeholders from PV manufacturing, equipment/materials, policy-making and strategy, capital equipment investment and all interested downstream channels and third-party entities. The goal is simple: to map out PV manufacturing out to 2030 and beyond.

Read Next

India’s state-owned company the National Hydroelectric Power Corporation (NHPC) has issued a tender seeking up to 2.4GW of solar PV capacity across India.

MCPV has raised €4.2 million (US$4.6 million) to support the development of its 4GW heterojunction (HJT) cell factory in the Netherlands.

DNV’s report shows that 2024 is a landmark year, but the energy transition still faces financial and political headwinds.

Solar PV is set to account for 80% of the 5,500GW of new clean energy additions made by 2030, according to the IEA.

As of H1 2024 India has reached an annual nameplate capacity of 77.2GW for modules and 7.6GW for solar cells, according to Mercom India.

The partnership aims to boost the sale of solar cell equipment in India amidst a growth in capacity announcements.

Subscribe to Newsletter

Most Read

Upcoming Events

https://www.pv-tech.org/gautam-solar-expand-module-manufacturing-capacity-5gw-april-2025/